<center id="lxu0n"></center>
        免费人成又黄又爽的视频网站 ,国产又黄又爽,中国国产一级毛片视频,久久无码高潮喷水免费看,国产一本一道久久香蕉下载,久品精品一区二区,欧美xxxx新一区二区三区,在线无码免费网站永久
        Hotline:400-880-1556

        English




        IEC 60598-1: 2020 edition standard update instructions

        Author:中認聯科 time:2020-09-21 Ctr:4397

        IEC 60598-1:2020 luminaires. Part 1 of general requirements and tests was officially released on August 17, 2020. IEC 60598-1:2020 is the ninth edition released this time and will replace IEC 60598-1:2014+A1 : The 2017 version.

        image.png

        Compared with the previous version, the new version includes the following major technical changes:

        1. Add PELV and related requirements. Due to transient protection circuits and EMC reasons, the market has a strong demand for PELV circuits. Considering IEC TR 63139 (under development), where SELV appears in the standard, the addition of PELV related modifications involves Chapter 3, Chapter 4, Chapter 7, Chapter 8, Chapter 10, Appendix X, etc.;

        2. Modified Table 10.3 and Article 3.3.19 for high protection currents. According to the regulations stated in the manual of 3.3.19, the power supply current limit of 20A or more shall be added on the basis of the original applicable objects, that is, the applicable objects of this clause are Permanently connected lamps with a power supply current of more than 20A and a protective conductor current of more than 10 mA, and the corresponding limit in Table 10.3 is changed from 10 mA to 10 mA or in accordance with the manufacturer’s instructions;

        3. Article 3.3.26 adds the marking requirements for wall-mounted lamps within the reach of the arm, and requires additional instructions for fixing the cable to the wall;

        4. Article 3.2.27 adds requirements for constant light output function and programmable current output;

        5. Article 4.30 Non-user replaces the electric shock protection cover used for light source lamps;

        6. Article 4.24.2 Blu-ray hazards delete category 0 hazards;

        7. Article 5.2.16 adds the component standard IEC 61984 that the connector should comply with, as well as additional requirements such as polarity interchange, mechanical locking, protection against electric shock, short circuit protection, and cable clamping;

        8. Article 3.3.25 adds the requirements of cable UV protection;

        9. Article 4.34 requires lamps not to emit harmful electromagnetic fields and should comply with EMF IEC 62493;

        10. Updated the functional grounding and protective grounding and their requirements in the 1.2.73 standard, including adding definitions, adding the qualifiers of "function" or "protection" to "grounding" in the clauses; in Appendix G, adding The description of the disconnection of the functional ground (if separate) when measuring the protective conductor current is added, and the functional ground terminal or contact that can be touched should be regarded as an accessible part and tested when measuring the contact current;

        11. Article 4.35 puts forward the test requirements to prevent the fan blades driven by the motor for cooling in the lamps from being touched, and gives the exemption test conditions, such as low hardness, low speed and low power;

        12. Article 3.2.2 Modify the marking requirements of rated voltage, delete the situation that does not need to be marked with rated voltage, that is, all lamps must be marked with rated voltage in volts;

        13. In the provisions of Article 5.2.10, the provisions that meet the requirements of 5.2.10.4 can be used as an exception to the use of flexible cord holders. The additional 5.2.10.4 provides for exceptional conditions, including overcurrent protection devices. The highest short-circuit current reached does not exceed 2A, and the highest voltage of various Class III lamps, and the corresponding qualification test requirements;

        14. The measurement network in Appendix G for the measurement of contact current and protective conductor current is revised;

        15. Modified the contact voltage limit value of irregular DC voltage in 8.2.3c);

        16. Article 1.2.96 Luminaires (PoE) that rely on Ethernet power supply that meets IEC 62368-3 power supply are connected, involving definitions, structures, thermal tests and an appendix introducing PoE luminaires;

        17. Article 9 IP adds high pressure and high temperature water blowout protection IPX9 (80℃) and high pressure and low temperature water blowout protection IPX9 (15℃) and its test requirements;

        18. Amended Appendix D to introduce alternative thermal tests for lamps whose ta mark is higher than 25℃;

        19. In Article 0.2, 4.14.1 was added, and relevant requirements for rail-mounted luminaires were added, including definitions, and rail-mounted luminaires were added to 4.14.1 test objects, and a requirement was added in Chapter 4, that is, rail-mounted luminaires It shall be tested in accordance with IEC 60570 Annex A;

        20. The test method of 10.2.2 to increase the electrical strength of DC lamps is modified;

        21. Amended Appendix D and added the temperature limit to Table 12.1 and Table 12.3. For lamps marked with F, the covering layer is changed to directly contact the lamp instead of covering the outside of the box before;

        22. The minimum torque of the metal gland test in Table 4.2 is reduced from 6.25 Nm to 4 Nm;

        23. Amend the requirements for protective impedance devices (4.10.4) in Section 4.10.4 and Appendix U, and modify the quantity requirements of Y1 and Y2 to be expressed in tables, and according to the power supply voltage, impulse withstand category, and insulation of the jumper And the number of capacitors required by the capacitor type (Y1, Y2 or Y4). The relevant amendments involve Chapter 4 and Appendix U;

        24. Amend the second paragraph of 5.2.14 to modify the category III plugs used in lamps and lanterns, in the original requirement that category III plugs cannot be connected to the grid power socket, "cannot be connected" is changed to "cannot be electrically connected", and The test method is added, and the relevant modification involves Chapter 5 and Chapter 4.


        Related Articles
        • Beginner’s Guide for Compliant Power Bank Production: Required Documents & Audit Flow for CCC Certification

        • Foreign Trade Manual: Core Points of Singapore IMDA Certification Application for Wireless Mice

        • Full Guide to Core Requirements of Brazil ANATEL Certification for Smart Glasses Market Access

        • Must-Know for Manufacturers: CCC Certification Procedures & Compliance Rules for Mobile Phone Chargers

        Follow Us
        主站蜘蛛池模板: 91福利导航| 国产成人亚洲综合网色欲网久下载| 亚洲中文字幕久久精品无码喷水 | 国产av永久无码青青草原| 99热久久这里只有精品| 国产精品任我爽爆在线播放| 精品黑人一区二区三区国语馆| 青青草视频免费观看| 国产精品十八禁在线观看| 久久久久人妻精品一区二区三区| 国产成人免费ā片在线观看老同学| 欧美国产日韩久久MV| 国产午夜精品福利91| 国产精品美女久久久久av爽| 国产福利一区二区写真| 久99视频| 色欲天天婬色婬香视频综合网| 亚洲A∨熟女自拍| 欧美z0zo人禽交另类视频| 国产成人午夜福利在线观看| 日韩精品一区二区三区四区五区六 | 久久亚洲国产精品一区| 无码av波多野结衣久久| www.com黄色| 中文国产成人精品久久水| 欧美交a欧美精品喷水| 囯产精品久久久久久久久久妞妞| 69福利导航| 欧美精品国产| 亚洲三级视屏| 又粗又长美女电影在线| 无码视频一区二区三区在线观看| 亚洲国产精品悠悠久久琪琪| 人妻精品动漫h无码| 日韩小视频| 亚洲国产中文字幕在线视频综合 | 国产乱妇无码大片在线观看| 欧美成人午夜在线观看视频| 亚洲无码人妻| 免费无码成人AV片在线| 亚洲国产欧美日韩另类|